12 layers MINI Toys PCB Board Rigid
1, Turnkey solution for PCB Assembly
2, PCB Assembly, PCB fabrication, electronic parts sourcing
3, Electronic Contract Manufacturing.
4, SMT&DIP&PTH&BGA Assembly
5, Quick turn PCBA prototype.
6, X-ray test, the Internal Circuit Test (ICT) , Functional Test (FCT)
7, Sample and small batch orders are accepted.
PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line works wear anti-static and dust-proof clothing.
4, All operators shall pass strict training before they start to work.
5, SMT Equipment:solder paste printer in Jidakang, Mounter in Samsung, Re-flow, Wave Soldering, Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
7, PCBA Test: AOI inspection, ICT test, Functional Test and X-ray test.
8, Package Processed:
0201, 0402, 0603, 0805, 1206, 1608, 2125, 3216
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP
10, Materials:FR-4, FPC, Metal, High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
11, Material Brand:KB, SHENGYI, NANYA and so on.
Below are about our quality control procedures:
Supplier Evaluation And Audit
Suppliers must be evaluated before approval by Yingstar's supplier evaluation team. In addition, Yingstar will appraise and rank every supplier once a year to guarantee the suppliers provide the quality materials meeting Yingstar's requirements. Furthermore, Yingstar continuously develops suppliers and promotes them to improve their quality and environment management basing on the systems of ISO9001.
Contract Review
Before accepting an order, our engineering teams will check all the details of this project and make sure we have the capabilities to handle it.
Preparation, Review And Control Of Manufacturing Instruction
Before processing an order, our engineering teams will check all details of this project, and if any issues detected, we will report them to customers and give them our solutions or suggestions.Once our solutions or suggestions are approved by our customer, we will start to process this order.
Incoming Control IQC
All materials must be verified and approved when going to the warehouse. Yingstar establishes strict verifying procedures and working instructions to control the incoming electronic materials. Furthermore, Yingstar owns various precise inspection instruments and equipment to guarantee the capability to rightly judge whether the verified material is good or not.
Process Controls Of Fabrication
Right manufacturing instruction (MI), total equipment management and maintenance, strict WIP inspection and monitoring as well as working instructions, all these make the whole production process totally controlled.
Strict PCBA tests
We perform multiple quality assurance procedures before shipping out any of our board to guarantee our quality.
These testing methods include:
· Visual Inspection,
· X-Ray Inspection,
· AOI Inspection(Automated Optical Inspector),
· ICT test (In-circuit test), and
· Functional test (test guide need to be supplied).